Please Install Flash Player
Download from here
  

R&D Setup

Home » R&D Setup
Strength of R & D Staff
We have been able to unify at CRW all the skills and facilities for producing world class products which is reflected in growing export shipments to diverse destinations across the globe.

Machinery/Equipment used in R & D
Chemical condition of Fibre, Yarn and Rope at different stages.

Yarn size control and verification.

Diameter and density checks for uniformity and correct density.

Lubricant absorption in the rope.

Checks of lay length and lay angle.

All test samples are drawn under tension specified by ISO 4345 and chemical and physical analysis is done under procedures specified by ISO and DIN.

Choose your language:   English   Espanol   Francis   Deutsch   Italy   Portugues